I piled brush and trees a few weeks back with the Deere. I burned it all last night from 7 PM until Midnight. It's to hot to do it during the day. It's been in the mid 80s. I was back at it at 6 AM this morning. I had a bunch of dirt that was under the brush pile to move. To move it I first I used the Deere's front bucket then the box blade. Also I did some more leveling with the box blade by pulling more dirt from the front to the back of my yard.
. My shed is delayed until the first of April. I have a few more problems with the John Deere. I put a new PTO switch on it then found out the shaft that a bush hog attaches to is bent. I guess that's why the Deere was free. Also the power steering cyn is leaking.
I replaced the Deere's power stearing cyn, replaced all it's grease fittings, degreased everything, new air filter and changed the oil and filter. The coolant looks new. I did check it's strength using my gizmo with the little balls in it. They all floated to the top of the sight window. I spent another $400. Some how I poked a hole in one of the new front tires side walls. I plugged it
Post up some pics of the 2 different pipes that you are joining together. Is it a stright connection or a 90* connection.
I used 4" rubber connectors with SS hose clamps. https://www.amazon.com/POWERTEC-701...t=&hvlocphy=9011757&hvtargid=pla-496781919092 .
I used 2 of them to.
The Lowes that is near me is the same way. Only one guy in the Electrical Dept and the Plumbing Dept that knows what they are doing. The rest is useless. It's like that in the whole store. A few weeks ago I went to our Home Depot. I had a big order to do. $3,000. They sent all the guys home that worked the Pro Desk because one of them came down with the cone head virus. So I was on my own. The people on the floor was of no help. I spent 7 hours gathering up all my supplies. After check out three guys helped me load my truck and trailer. I had to tell them how to do it. They kept telling me that I would have to make 2 trips. I proved them wrong.
Are you talking about my sheds base/platform. The shed has its own joists which are 2"x 6"x 12' 16" on center and are pressure treated. The flooring is 3/4" pressure treated plywood. I am going to put a skirt around the bottom of the sheds outer edge using concrete board. Also I'm pooring a concrete slap at the front (20'x 8 ') and the two sides of the shed so I don't see critters being a problem. I had none with my other two sheds. Go here to see details about my new shed. https://www.zl-oa.com/community/threads/remodeling.19877/page-18
That looks touchy. Just don't let it roll on top of you. When I get stuck with my DEERE I lower the bucket down to get the front tires off the ground then put 2"x 8"x 6 ft planks under the front tires then lower the tires back to the ground. Then back up very slowly.