Well, if that's the case. I'm only out of compliance on 18 wire runs.
It may not be the case for a basement. If anything it looks more finished when the wires are in gray conduit
Looks good. What does a door like that cost. You going to pour a slab in front of the door.
I have 5 of these on my one acre of property. https://www.amazon.com/dp/B072MMKX9...d=3RLTI79VZQFF2&psc=1&ref_=lv_ov_lig_dp_it_im . and 6 of these. https://www.amazon.com/Photocell-Wa...torch+led+porch+light&qid=1628850279&sr=8-104 . The oldest one is about 8 years old.
Yesterday I primed and painted my new sheds ceiling. This morning I put on all the ceilings outlet covers. When I painted the ceiling I first started with kilz 2 since the OSB was exposed to the elements. Then I used bonding primer because of the OSB the paint might peal. Last but not least I used ceiling flat white paint. I went to my hand surgeon last week. I do not need surgery. My finger is broke and has three very small shards of bone at the tip. They may work their way out through the dead tissue at the tip of the finger. I go back to the hand surgeon in a month.
![20210815_085025[1].jpg 20210815_085025[1].jpg](https://www.zl-oa.com/community/data/attachments/29/29551-99ac6c31aedeb736ea1b2641060a3010.jpg?hash=maxsMa7etz)
Looks good. Today on my new shed I installed a (free) new ceiling fan and put up my hoist. For the hoist supports I went with 2"x 8" x 28" boards two feet apart. I used eight 4"x 1/2" S.S. lag bolts to screw the boards to the two trusses. For the hoists slider I used 2 sections of box steel. I put one inside of the other for extra strength then screwed them to the two boards using four 4"x 1/2" S.S. lag bolts. Also I installed a (free) four foot flush mount shop light along with two LED bulbs ($16) above my work bench. Time spent about 6 hours. Tomorrow I'm going to install some four foot LED 5,500 lumens shop lights.__________________________________________________________________________________________
![20210817_201352[1].jpg 20210817_201352[1].jpg](https://www.zl-oa.com/community/data/attachments/29/29559-f27a485695620305e020be7a16ef91c7.jpg?hash=8npIVpViAw)
It would be nice to have a basement. I know only two guys here in FL with one. The one guy has a 30 yard gun and archery range in his basement and it has A/C.
Looks real good. When can I move in.
.
Went to LOWES this morning for a bigger/better A/C ($200) and other supplies. Today on my new shed I installed a bigger G.E. window A/C unit. It's for rooms up to 350 square feet and is 8,000 BTUs. The old one is for 250 square foot rooms and is only 6,000 BTUs. The shed it 240 square feet. I finished the back wall before installing the new A/C. I need to make a small roof for over the outside part of the A/C. Rain is getting inside the shed.
![20210820_145555[1].jpg 20210820_145555[1].jpg](https://www.zl-oa.com/community/data/attachments/29/29585-513e41f0e588914e7bdde423409de81e.jpg?hash=UT5B8OWIkU)
18, 2 single axle dump truck loads. Thick in some places and thin in others. Box blade works pretty well for the initial smooth and spread but it's tough to keep it from digging on the final spread unless it's totally flat. I am on the lookout for a box spring from a mattress set to drag and spread it more evenly.
Nice. Did you just get it. What's it called.
Today on my new shed I made a roof/hood ($26) for over my window A/C. I made it from an old speed limit sign and one inch aluminum angle. It's 23" long and 24" wide. I used S.S. button head bolts and S.S. nylon locking nuts. I made it because rain was getting inside the shed. The roof only has two inches of over hang. Also I put trim arond the A/C on the outside. Time spent about five hours. I pulled two bone shards/fragments from my finger.
.
![20210820_191823[1].jpg 20210820_191823[1].jpg](https://www.zl-oa.com/community/data/attachments/29/29605-77a9ae320ac2264d90f2bbe7a3381fd3.jpg?hash=d6muMgrCJk)