Great job Bill.
. Did you use a table saw to do the miter cuts.
With all them drawers I'd forget which ones that I looked in.
.
That would take me a year.
.
Nice.
.Come on up.I'm gonna' have to take a ride North this year and check it out! Great job Bill.
My fireplace was not drawing correctly. It's called a zero clearance fireplace. This past Sat. I replaced my fireplace draw vent pipe. The pipe was a plastic flex 4" dryer vent.
.
. It melted.
Also I installed 3/8" OSB on the inside of the fireplace walls. I drilled four 3" holes in the ceiling to let heat out. The chimney O.D. is 14 ft. tall, 4 ft. deep & 7 ft. wide. It has a divider at 8' so that the double flue pipe does not flex.

Thank's. I still need to do the stucco.
This past Sat & Sun I painted my plastic shed the same colors as my house. I used Valspar bonding stain blocking latex primer 2 coats. $30/gal. I used Bear premium plus ultra enamel paint. $45/gal. The roof & endgables took 3 coats of brown & the walls took 2 coats of almond.
Total cost with rollers, brushes & trays around $175.
Thank's Bill. I'm going to do my Medal shed the same way.