Remodeling

:hello: The pee trap is not nickel plated. It's made of plastic and it is the same price as the chrome finished traps. Chrome don't get you home. :laughing7:. Why do the call it a pee trap. You don't pee in a sink even though I did once at a Night Club back in 1978. :laughing7:.
 
:hello:Monday I mounted all the towel bars and medicine cabinet. They are all done in brushed nickel by Moen. They are the Sage line. I installed the handles on the vanity and cabinet. Also I had to lower the vanity light 3 inches. Today I'm going to finish the grout. I had to special order the grout. It took 4 days to get it. Next I'll finish up with the pocket door frame and trim. The last thing to do is caulk all the seams. IMG_8253.JPG IMG_8248.JPG IMG_8249.JPG IMG_8250.JPG IMG_8251.JPG IMG_8252.JPG
 
:hello: Tuesday I broke an FN tile. It broke when I was removing the 1/2 inch plywood from on top of the bath tub. I thought I was going to break more tile removing the bad one. I used my 3 inch dremal saw to section the tile so that I could get it out easier. IMG_8258.JPG IMG_8259.JPG IMG_8260.JPG IMG_8261.JPG IMG_8262.JPG
 
:hello: Well I had another set back. The bathroom pocket door was catching on the tip of a drywall screw from the patch that I done for the old location of the hall outlet. The screw was 24 inches inside the pocket door frame and 12 inches off the floor. I attached a brass chisel to a 3 foot long pipe and knocked out the screw. Part of the wood from the patch came out with the screw. :laughing7:. I had to spread the pocket door frame in order to get the pipe in the doors frame. I finished up with the last of the drywall. I hung old bed spreads in the hall to keep dust from getting in the rest of the house. I had to get this done before my Wife came home. She just dusted the house. I also removed the trim that goes around the pocket door frame. It needed cut more narrow. It stuck out to far past the drywall and to close to the door. I had to cut a half inch off the floors tile so that the transition strip will be centered under the door. Saturday come hell or high water I will be done with this bathroom. _______________________________________ IMG_8276.JPG IMG_8279.JPG IMG_8280.JPG IMG_8281.JPG IMG_8268.JPG IMG_8271.JPG IMG_8272.JPG IMG_8270.JPG IMG_8273.JPG IMG_8274.JPG IMG_8269.JPG
 
Just when you think you have it done! At least the screw was touching the door and not a wire or plumbing pipe. Sometimes pocket doors are the only thing that will work, but they can be a PITA! Your wifes idea about the shower shelf turned out well. Looking good but I am sure you have had about enough of that bathroom!
 
:hello: I finished up Saturday at 4 PM. I installed the pocket door lock. base board, door trim, floor transition strip, and all the caulking. I still need to do the 1/4 round molding around both sides of inside of the door frame. Also we ordered a new set of shower door enclosures from LOWES. $585. IMG_8285.JPG IMG_8284.JPG IMG_8286.JPG IMG_8287.JPG IMG_8289.JPG IMG_8292.JPG IMG_8293.JPG IMG_8294.JPG IMG_8295.JPG IMG_8296.JPG IMG_8297.JPG IMG_8298.JPG IMG_8283.JPG IMG_8300.JPG IMG_8301.JPG IMG_8302.JPG IMG_8303.JPG IMG_8299.JPG
 
Last edited:
:hello: Our shower doors came in today. I ended up getting them from HOME DEPOT instead of LOWES. The style that we wanted LOWES could no longer get. Price shipped to HOME DEPOT was $800. They are made by Contractors Wardrobe Doors out of Valencia CA here in the USA. Model 7800. 60" wide and 66" tall & the glass is 5/16" thick. They are frameless sliding tub doors in brushed nickel with circular thru-glass pull. No handle. IMG_8339.JPG IMG_8340.JPG IMG_8341.JPG IMG_8338.JPG
 
Last edited:
IMG_20191117_103757.jpg
Good enough! Tub surround, floor, new shower head and commode internals. The new type commode seals are much easier than the old wax seals. I think the refresh came in at ~ $500. The waterpick shower head set me back $50, those things are $100 for the nice ones with the stainless hose. The window film and flooring tiles were clearance at HD.
 
Nice job! Just in time for the holiday season as well. Getting a big project finished is always rewarding, especially if it pleases SWMBO!
 
I got a new calking gun, makes all the difference in the world on laying down a nice bead. Don't skimp on these. Buy the best available.

There was a deadline because we will be having a house full over Thanksgiving weekend.

15740299836693151338803197308375.jpg

I'll go RJ on our primary bathroom when that time comes... saving for a garage, priority #1
 
:hello: Nice job on the surround. :notworthy:. I can never lay a good calk bead down. I put masking tape on both flat sides of the corner, lay the calk, smooth it out with my finger. Then remove the tape ASAP. __________________________________________________________________ IMG_8347.JPG IMG_8349.JPG IMG_8350.JPG IMG_8351.JPG
 
Last edited:
:hello: I've been wanting to install a window AC in my garage for the past 6 years or so. I spent about 12 hours finishing the drywalls corner bead, orange peel texture, marble window seal, caulking and painting. It took me about an hour to install the AC unit. I bought a MIDEA 550 square foot AC unit from LOWES. Price $460. Four year warranty $90. I have to mount my 2 medel shelves back on the wall and put all my bike parts back on the shelves. IMG_9440.JPG IMG_9441.JPG IMG_9439.JPG IMG_9443.JPG IMG_9444.JPG IMG_9445.JPG IMG_9448.JPG IMG_9447.JPG IMG_9449.JPG IMG_9450.JPG IMG_9451.JPG
 
Last edited:
:hello: Today I bolted my metal shelves to the wall. First I mounted a 2"x 4"x 8' to the wall because the marble window seal sticks out two inches from the wall. Then I put all my bike parts back on the shelves. A few years ago I made a shelve above my tool boxes for more NOS parts. IMG_9452.JPG IMG_9453.JPG IMG_9455.JPG IMG_9454.JPG
 
IMG_20200729_154334.jpg IMG_20200802_182637.jpg

Kitchen floor went from peel and stick early 80's to a vinyl plank no glue over this rainy weekend. Bought 240sf @ 2.30 per from Sam's club and used most all of it. Flooring is a young man's game, my knees and back are toast. Got a bit of trim, some calk and shave a door down to finish it up. When they say ez in the description, take that with a grain of salt:D
 
:hello: Looks good. I still have 6 rooms and a hall way to do with laminate flooring. I have (1,482 square feet) 114 boxes of Pergo XP alexandria walnut flooring in our spare bedroom. Luckily I have my two sons to help me. One son does the measuring and the other does the laying and I do the cutting. We did two rooms 24x16 feet in under 8 hours.
 
:hello: Today I spent from 7 AM to 7 PM laying 15 patio blocks for my 12'x20'x7' shed. Man I'm wiped out. It was 85* today. At least the humidity was under 40% and it was cloudy most of the day. The shed base is made out off 4"x4" treated lumber so I had to cut the 2" spacing on the patio block to 4". I also had to dig out the roots of two trees that I cut down. They was in the way of two of the patio blocks. I used 15 patio blocks in case I ever want to drive a car into the shed. _______________________________________________ 20210315_064758[1].jpg 20210315_182639[1].jpg 20210315_183049[1].jpg 20210315_183256[1].jpg 20210315_183023[1].jpg 20210315_182925[1].jpg 20210315_182955[1].jpg
 
Last edited: