:hello: Today on my new shed I degreased the compressors pump and sand blasted it. Then took it apart to replace a few leaking gaskets. I replaced all the hardware with stainless steel. Also I made an extension for the oil drain and the drain on the bottom. Time spent about 6 hours. 20211223_113631[1].jpg 20211223_113558[1].jpg 20211223_113542[1].jpg 20211223_113525[1].jpg 20211223_113456[1].jpg 20211223_113153[1].jpg 20211223_113808[1].jpg
 
:hello: Today on the new shed for the compressor I mounted the electric motor and pump. Installed a new pressure check relief valve which goes in the top center of the tank and a new 1/4 inch air line that goes from the relief valve to the SQUARE D 240 VAC switch. Installed the new V belt. I also drained the pumps oil and cleaned the site window. Time spent for everything that I done was about three hours. https://www.amazon.com/dp/B06XHB1MBN?psc=1&ref=ppx_yo2_dt_b_product_details . A lot of guys think their compressor pump or electric motor goes bad but 90% of the time it's the pressure check relief valve that goes in the top center of the tank. It's a $25 fix and about a two hour job. _______________________________20211224_083224[1].jpg 20211224_121638[1].jpg 20211224_121806[1].jpg 20211224_092433[1].jpg 20211224_121651[1].jpg 20211224_082431[1].jpg
 
Last edited:
:hello: Today on the new shed I wet sanded (1200 grit paper) and buffed the compressor's air tank. It had a lot of over spray and orange peel. When I painted the air tank I used WALMAT ($1.50 a can) fast drying enamel. Time spent about 5 hours. _________________________________20211226_112612[1].jpg20211227_090931[1].jpg 20211227_095919[1].jpg 20211227_094754[1].jpg 20211226_115913[2].jpg 20211227_094600[1].jpg 20211227_095837[1].jpg 20211227_113052[1].jpg 29921-acb6864cbb1e6ce1edfeabc345e342e8.jpg
 
Last edited:
:hello: For the past 3 weeks I painted the new sheds ceiling & walls. I stated with a coat of KILLS 2 then a coat of BONDING PRIMER. Finished the ceiling in flat white. I done the walls in BATTEL SHIP GRAY. It took 3 coats. The OSB which I call SOB :laughing7: soaks up paint like a sponge. Yesterday I tied the compressors madifold systems drains into a single drain. It will run threw the floor as well as the compressors drain. I also cut & primed the base board, window and door trim. I sanded all the crud off the floor and added 3 inch exterior screws. 30% of the floors nails missed the mark. 20220217_080209[1].jpg 20220217_080457[1].jpg 20220217_095834[1].jpg 20220214_102756[1].jpg 20220214_102820[1].jpg 20220221_114750[1].jpg 20220222_111744[1].jpg
 
:hello: This past Sunday for my new Bike Shop/Shed I laid the 12" x 24" vinyl tile commercial grade flooring made by ARMSTRONG. It's glue down style. It was free. So was the spray glue. My friend Wayne works for a Company that does remods on Walgreens Stores. He gets all kinds of building supplies that is left over form jobs. Today I cut the hole in the east wall of the compressor rooms closet for the two vents and installed the outside vent. 20220301_074552[1].jpg 20220301_074607[1].jpg 20220301_074620[1].jpg 20220301_074634[1].jpg 20220301_074748[1].jpg 20220301_075401[1].jpg 20220301_082843[1].jpg 20220301_175020[1].jpg 20220301_175054[1].jpg This is close to what I got. The vinyl that I got you can't buy it in the big box stores. https://www.homedepot.com/p/Armstro...OIR0peX0TvKx18Yrq5RoCcj8QAvD_BwE&gclsrc=aw.ds .
 
Last edited:
:hello: Today for my work shop/shed I installed the compressors inside vent, some base board and wired up the compressor. 20220303_081052[1].jpg 20220306_104452[1].jpg 20220307_103326[1].jpg 20220307_110746[1].jpg 20220307_122152[1].jpg 20220307_164740[1].jpg
 
:hello: Today I finished the rest of the trim and base board. I had to put ten hose clamps ($26) on the compressors six manifold drains. They was leaking water. I also bought 3 floor mats from LOWES. $160. I tested the compressor. I found no leaks in the lines. Compressor room is really quite. 20220310_165232[1].jpg 20220310_165323[1].jpg 20220310_165420[1].jpg 20220310_165446[1].jpg 20220310_165552[1].jpg 20220310_165624[1].jpg 20220310_165523[1].jpg 20220310_165729[1].jpg 20220310_183934[1].jpg
 
:hello: I should stop now.:laughing7:. I want to put tile on the shelves as what is on the floor because the OSB holds a lot of dirt. I still have some outside caulking and paint touch up to do on the inside. Then load it up with tools, spare bike parts and four bikes that are down to the frames.
 
Very nice RJ. You probably need a shed for your bikes now that you have a shop.
:D
 
:hello: Thank's. Before I start on other peoples bikes/ATVs I'm going to finish my own bikes. If I don't they will never get done.
 
:hello: Today for my new bike shop/shed I put a 4th coat of wax on the floor. Put down shop rugs and rubber work mats. Made two metal plates for under bikes so that the rubber mats don't get tore up. Mounted my gun rack. Bolted three parts tray holders to the wall. Last I put my 1983 Honda CB 650SC Nighthawk on the hoist. It's been collecting dust for the past 12 years or so. Time spent about seven hours. ________________20220315_162907[1].jpg 20220319_094826[1].jpg 20220319_095013[1].jpg 20220319_095323[1].jpg 20220319_095511[1].jpg 20220319_095613[1].jpg 20220319_103823[1].jpg 20220319_103940[1].jpg 20220319_104112[1].jpg 20220319_104410[1].jpg 20220326_160041[1].jpg 20220326_160143[1].jpg 20220326_160204[1].jpg 20220319_101804[1].jpg 20220319_101933[1].jpg
 
Last edited:
PXL_20220330_225613660.jpg PXL_20220330_225542966.MP.jpg PXL_20220330_225425527.jpg

Newly established garlic patch coming on strong. The size of the garden went from 21x15 to 21x39. I had rolls of concrete reinforcement laying around so a couple of hours wrestling with that and I now have a base fence to add some chicken wire to. It was too sloppy to drag the box blade but I will till it when we dry out for a bit.
 
Critter list includes deer, raccoon, groundhog and rabbit. Then there is the tomato worms and slugs to contend with.

That reinforcement wire was rusted pretty good and some of it broke off as I unrolled it. Using what is laying around the property.

I bought 100' of 36" high chicken wire for $58 plus $88 for (15) 6.5' posts and used 10. I will keep the others, they are ez to find a use for. Critter deterrent ain't cheap.
 
:hello: Whitetail dear here in FL seem not to get in peoples gardens. I gave up on planting a garden 30 years ago. Seems everything rots before it ripens. Also the bugs don't stop even if you spray for them.
 
It's getting to be deck season. I've got 2 to put on, front door will be roughly 5x12x3ft high with probably 4' wide stairs. Second on side of the house will be ~6x12x4ft high on 1 end and will step right onto the backyard. A quick Home Depot estimator program showed 4600 for the front alone. I kind of threw up in my mouth a little and didn't price the side deck. I did price the premium Timber Tech PRO reserve in driftwood but went for a pretty standard railing. WOW prices are up there.

Going over some details with a friend who knows way more than I do on these things and making a shopping list. I think I want picture frame the perimeter so the sizes may change a bit. Even if I go cheaper line of product it would only save ~15% because of the small sq footage.
 
:hello: A few weeks ago I tiled all the shelves in my new work/bike shop. Time spent about four hours. I had two boxes of tile left so I said why not do it. :laughing7:. Time to load up my new work shop with all the parts to build my 1972 HONDA CT 70 K1, 1974 HONDA XL 70 K0, 1983 HONDA CB 650 SC Nighthawk and my 1997 SUZUKI DR 200 SC. Now I need to decide which one to do first. I think I'll have all the frames done first. 20220604_114703[1].jpg 20220604_114759[1].jpg 20220604_115027[1].jpg 20220604_115504[1].jpg 20220604_120804[1].jpg 20220604_121024[1].jpg 20220604_121107[1].jpg 20220604_121334[1].jpg 20220604_121515[1].jpg 20220604_123446[1].jpg 20220604_121813[1].jpg
 
Front and side entrance decks, timbertech pro reserve decking and aluminum railings. Side is done except for a step needed into the backyard and need to move the window unit to back window. Front needs it's steps and rail to complete it. 6x12 side and 6x16 front. Going to be looking to install some new doors soon and put up some lattice, the domino effect.