R. J.
Supporting Member
I thought the same thing.
. I did cut the bottom out of all the buckets for water drainage.
I thought the same thing.
. I did cut the bottom out of all the buckets for water drainage.
We are far enough from the beachs by time a Hurracane gets to our place most of the time they are down to a CAT 1. Having a 1/2" gap between each plank helps reduce wind load. Most fences that home owners have done are those prefabs from LOWES/HOME DEPOT do not have any spacing. Also they rot away in 5 years or so and the staples/nails rust away. They bow and twist in a few years. I got estimates from three Fence Co. 18K (prefab) to 22K (vinyl). I spent about 12.5K on materials. To pay for a six foot high fence 500 feet long with five gates that we done would of been near 40K. Most fence builders here in FL don't use concrete at the bottom of the posts. I used about 125/150 lbs on each post. They are set 20/24 inches in the ground. We set the 4x4 posts 5 feet apart. Most are set 6 to 8 feet apart.
That is a good size garage.
. Here in Deltona FL they allow a home owner to build a garage 35% of the size of your house.

Just wondering. The shed must of been a lot cheaper from Northern Cambria than from another place closer to your place.
Coming along nicely.
.


got to take a spin on the XS11, road around the house not up the gravel hill.
room for a quad and my XS750 with the bench folded.
bench deployed
little bit of propane heat when needed.
Looks really good. If I put down gravel like that it would be goan in a year. The FL sand would just absorb it. Also the weeds would grow threw what's left. Are you going to put down grass seed. That to is hard to do here in FL. The weeds take over before the grass has a chance to grow.