MARKUS: Pic #1 is all the hardware for the bathtub. Pic #2 is the brushed nickel P-trap set which is for the new under the counter mount bathroom sink.
This morning I took measurements for the bath tubs drain and over flow drain. I made a pattern outline of the tub on my tile using a black sharppie.
. Then I transfered all the measurements onto the bath room floor. The new tubs drain is in the same location as the old tub which is what was used before in the floor. I redone the over flow drain with new piping. When measuring for the height of the overflow pipe I used my largest key hole bit to find the center of the tubs overflow then measured to the floor. Then transfered that measurement to the bathroom.

This past Thursday I poured concrete in at the floors bath tubs drains. Today I set, leveled and screwed the bath tub to the studs and installed the 2 drains brushed nickel hardware. We are going to fill the bath tub with water for flushing toilets. If this hurricane hits us we may loose water. As of now it looks like the hurricane is going to skrit the East Coast of FL. _______________________________________________

Late this afternoon I installed 3 sheets of dura rock around the lower part of the bath tubs 3 walls and I put back the section of drywall that goes behind the sink. I had to take it out so that I could cut off the sinks drain flush with the walls studs so that I could get the new tub in. My wife wants a recessed shelve put in the shower stall. It's going to be 27 inches wide and 15 inches tall. I'll have to remove part of the center stud.

Haven't been doing much on the hall bathroom. Life keeps getting in the way. I done the second coat of drywall and sanded it. Got all the orange peel done. Time spent 7 hours. Also I did away with 4 large paddle switches and went with the double stack ones which eliminated one 2 gang box. I had to go in the attic and move some wires around in the light/fan/heater unit so that all 3 will have their own switch. I waited until 10 PM to go in the attic. It was still 90*. Time spent on the electrical redo 4 hours. I have some drywall touch up to do. Next up is a coat of KILLS primer. Then a coat of bonding primer.

To far to bend down and it would take to long for me to get back up.
. That foor drawer was a $220 option.
Thanks.
. All the cabinetry that LOWS and HOME DEPOT stocked was JUNK. It was all made of that pressed board crap. DIAMOND Cabinrt Builders also done our Kitchen Cabinets. They are very expensive. Our Kitchen cabinets was $6800 and our hall bathrooms 2 pieces was $1460. You pay for what you get as thet say.