Remodeling

:hello: I spent yesterday & today installing 7 Utilitech recessed 13 watt = 65 watt LED lighting in 3 closets, master bath shower & 3 in 2 hall ways. They cost $30 for 2. I made my own conduit boxes. The ones that was to be used cost $20 each which are to tall because I have a floor in my attic. I bought 7 gray 6"x6"x4" no hole conduit boxes for $8 each. I left one on all day just to see how hot the heat sinks get. 104* F. So the heat sinks are doing there job in keeping the built in transformer cool.
 

Attachments

  • IMG_1181.jpg
    IMG_1181.jpg
    108.7 KB · Views: 9
  • IMG_1183.jpg
    IMG_1183.jpg
    96.2 KB · Views: 9
  • IMG_1185.jpg
    IMG_1185.jpg
    64.1 KB · Views: 9
  • IMG_1186.jpg
    IMG_1186.jpg
    81.3 KB · Views: 10
  • IMG_1187.jpg
    IMG_1187.jpg
    62.2 KB · Views: 10
  • IMG_1188.jpg
    IMG_1188.jpg
    44.9 KB · Views: 10
:hello: Almost done with our handy cap bath. Painted it last week & done the tile over this past weekend.
 

Attachments

  • IMG_1202.jpg
    IMG_1202.jpg
    73 KB · Views: 17
  • IMG_1203.jpg
    IMG_1203.jpg
    71.6 KB · Views: 17
  • IMG_1205.jpg
    IMG_1205.jpg
    79.8 KB · Views: 17
Good job R.J.! I think I could make a real plumber outta' you Brother! LOL I've been doing it professionally for 35 years now so I'm qualified to say you did a good job. I also do tile on the side and that looks good too! Handy you are! :thumbsup::notworthy:
 
:hello: That's 2 things that I'd prefer not do do for a living. :laughing7: It is hard work. Thanks for the complements. I always say I'm a jack of all trades & a master of none except for making & testing weapons of mass destruction. :laughing7:
 
:hello: Finished up touchings such as paint & caulk this morning on our new 2 person Jacuzzi in our master bath. Tubs been in for awhile now. Did the tile Friday & grouted yesterday. I like the old school tile. I think anything bigger looks out of place in such a small area. This tub listed for $1100. I picked it up at Lowes for $300. It was the display unit with a few scratches but I was able to rub them out & it was the last one.
 

Attachments

  • IMG_1257.jpg
    IMG_1257.jpg
    49.5 KB · Views: 13
:hello: I had to shift to doing outside work for now. I needed to re-roof my shed. It had a metal roof. It had several holes & was rusted. I went with the wave shingle type. I need to use it for more storage. I spent Friday & today on it. I'm going to insulate & side the inside of it. I'm also going to run lights for inside & out along with some outlets.
 

Attachments

  • IMG_1554.jpg
    IMG_1554.jpg
    129.2 KB · Views: 13
Last edited:
:hello: Between yesterday & today I ruffed in the electrical. Used R13 insulation on the walls & celing. Installed 6 120 volt outlets & 1 GFI outside outlet. I installed 2 light switches one for the outside light & one inside light. I used 1/2 OSB for the inside walls & the ceiling. The shed had 24 to 27 inch on center studs so I added a stud between each existing stud & did the same for the roofs trusses. I also replaced all the rusty hardware on the aluminium siding.
 

Attachments

  • IMG_1320.jpg
    IMG_1320.jpg
    102.8 KB · Views: 10
  • IMG_1321.jpg
    IMG_1321.jpg
    115.6 KB · Views: 10
  • IMG_1324.jpg
    IMG_1324.jpg
    106.9 KB · Views: 10
  • IMG_1328.jpg
    IMG_1328.jpg
    107.6 KB · Views: 10
  • IMG_1327.jpg
    IMG_1327.jpg
    125 KB · Views: 11
  • IMG_1557.jpg
    IMG_1557.jpg
    97.6 KB · Views: 11
Last edited:
I think he did that so that in the winter when there is snow outside he can be in that nice warm shed like us Indiana guys Mad..:laughing7:

All the work looks real good RJ...I need to post some pics of my last few things I did last summer and this summer..
 
:hello: When it's 95 outside in my metal shed the temp reaches 160*. I know this because I have a oven thermometer in it. I also insulated my garage before the dry wall went up & I paid an extra $100 to have the attic over the garage blown in with insulation. What I can't believe is all you snow Country guys do not insulate your garage & or sheds.
 
Mine is insulated BIG TIME!! Walls, ceiling, doors, and floor! it can be -25 out side and with just a little k-1 heater after about hour its nice and warm, can wear a t-shirt while working!!!:headbang: :rr:
 

Attachments

  • image (5).jpg
    image (5).jpg
    78 KB · Views: 8
Here are some pics. Last July we got water in the basement so I ripped the carpet out and did tile in the family room and my oldest step daughters bedroom. Also repainted the bedroom and new trim and added an overhead light.
 

Attachments

  • image.jpg
    image.jpg
    37.1 KB · Views: 6
  • image.jpg
    image.jpg
    221.3 KB · Views: 6
  • image.jpg
    image.jpg
    143.4 KB · Views: 6
  • image.jpg
    image.jpg
    193.6 KB · Views: 5
After I was done downstairs I did the other daughters room upstairs. She wanted pink and white chevron and tiled the floor.
 

Attachments

  • image.jpg
    image.jpg
    52.5 KB · Views: 5
  • image.jpg
    image.jpg
    39.3 KB · Views: 5
This summer I did the back deck. Wife wanted a bench so I built it in.
 

Attachments

  • image.jpg
    image.jpg
    117.7 KB · Views: 7
  • image.jpg
    image.jpg
    79 KB · Views: 7
  • image.jpg
    image.jpg
    58.6 KB · Views: 8
  • image.jpg
    image.jpg
    75.9 KB · Views: 8
  • image.jpg
    image.jpg
    68.3 KB · Views: 7
  • image.jpg
    image.jpg
    74.3 KB · Views: 7
  • image.jpg
    image.jpg
    88.8 KB · Views: 7
  • image.jpg
    image.jpg
    65.1 KB · Views: 4
:hello: Glad to see someone else post up their handy work. :thumbsup: I like how you done this rail with the 45 & 22 1/2 degree angle's. It looks like an arrow pointing up.
 

Attachments

  • image (1).jpg
    image (1).jpg
    58.6 KB · Views: 5
Thanks. Those particular stairs I didn't build. The deck was originally 10x10. The decking was shot. I added onto it making it 16x16. I left those particular stairs alone and just covered them with new material. It ended up that those stairs were at a 45 degree angle. My local code requires the hand rail must have a top surface that is contoured or graspable. I ended up finding a cap that was treated and I put it over the 2x4. So originally that 2x4 was just a 45 on each end but when I tried to figure that miter for the cap, it was basically a 135 degree angle making each side cut a 62.5 degree angle. My saw will only go up to 60. I figured if the 2x4 was running at a 45 that a 22.5 would make it parallel to the 2x6 on the actual guard rail. That then made the rear angle a 90. I rounded all of the top 2x6 with my router to give it a soft look and to match the rounded edges of the deck boards. I wrapped the rim joists with deck boards that went up high enough to cover the edges of the decking. The underneath skirting was also a bit of a challenge. I ripped 1x6 in half and beveled the edges to make a shadow line and did the alternating 45 degree angles.
 
Back
Top